<p id="yge1z"></p>
    1. <td id="yge1z"></td>
        <track id="yge1z"></track>

        
        

        1. <p id="yge1z"></p>
            <td id="yge1z"><ruby id="yge1z"></ruby></td>
            Vacuum furnace
            n_bb1
            current location: Home?>>? 新闻资讯 >> Company news

            Contact information

            Taicang Huarui Vacuum Furnace Co., Ltd
            Address: No.1, Nanzhuan Road, Shuangfeng town, Taicang City
            Contact person: Zheng Xinghua
            Mobile: 13285178098
            Contact: Guan Zhanlong
            Mobile: 18606226806
            Contact person: Zheng Shuai
            Mobile: 13285179528
            Tel: 0512-88826556
            Fax: 0512-53630028
            Email: 1306769879@qq.com
            National Service Hotline:
            0512-53630028
            Website: www.serunique.com

            Operating procedures for vacuum brazing furnace of vacuum furnace

            Release date: 2014-04-27 00:00 source: http://www.serunique.com Click:

            I. before opening the vacuum furnace, ensure that water, electricity and gas are in operation. When the voltage is 380V, there shall be no 10% deviation. The air pressure is 0.6MPa, and the water pressure reaches the lowest value (0.5MPa). Only after reaching the above requirements can power on and operate.

            2. Before discharging, check the heating room of the equipment. The heating room must be clean and free of sundries, dust, oil, water, etc. In view of the goods placed, the same dry cleaning, no water stains, oil stains, etc. should be cleaned before placing.

            3. After loading, turn the knob to the "door closed" position. Then, start the "mechanical pump" and "coarse extraction valve". To extract air from the vacuum unit and furnace, turn over the power supply of the vacuum furnace together (in general, the power supply of the vacuum meter is started together with the main power supply).

            IV. when the real void degree is higher than 1000Pa, the monitoring point "J2" of vacuum gauge will be on. At this time, the "roots pump" can be opened. If the conditions are not met, "roots pump" will not be opened, and there will be no response after clicking the button.

            V. when the real void degree is higher than 7pa, the vacuum gauge monitoring point "J1" will light up. At this time, open the "front stage valve" and "dispersion pump". Preheat the "dispersion pump".

            Vi. when the preheating time of the "dispersion pump" reaches 90 minutes (the counter on the touch screen can be investigated), close the "coarse pumping valve" and turn on the "high valve" to pump high vacuum into the furnace.

            VII. When the furnace vacuum degree reaches the working vacuum degree (the monitoring point "J3" of the vacuum gauge is on, pay attention to the high setting of the initial monitoring point, when it can set itself or reach the required vacuum degree, open the heating by itself), open the heating, and start the operation together with the temperature control meter (the heating curve needs to be prepared in advance).

            VIII. After the completion of the whole process of heating and heat preservation, "process finished" alarm, together with the heating active closure.

            IX. if natural cooling is selected, let the vacuum furnace equipment operate as usual. When the equipment is naturally cooled to the outlet temperature, close the "high valve", "dispersion pump" and "roots pump", leaving only the "mechanical pump" and "front valve" to vacuumize and cool the "dispersion pump". Turn the knob to the "door open" position together. Close the "vacuum gauge" and open the "manual air release valve" for air release. When the air pressure in the furnace is balanced with the atmospheric pressure, the furnace door will open actively, and the "manual air release valve" can be tightened together with the material taken out. When the "dispersion pump" temperature is cooled to room temperature (about one hour), the "mechanical pump" and "front stage valve" can be closed. Close off water, electricity and gas. Complete the whole process.

            10. If strong cooling is selected, after step 8, close "vacuum gauge", "high valve", "coarse pumping valve" and "dispersion pump", leaving only "mechanical pump" and "front valve" to vacuum and cool the dispersion pump. After opening the "charging valve" and filling nitrogen or argon into the furnace to reach the basic balance with the atmosphere (there is a pressure gauge to control the starting detection point of the fan and the upper inflation detection point), open the strong cooling fan until it cools to the outlet temperature (in the process of strong cooling, air replenishment is the active control). Close the "charging valve". After cooling to the furnace outlet temperature, turn the knob to the "door open" position. Then unscrew the "manual air release valve" and inflate it to balance with the atmosphere, the furnace door will open actively, and then tighten the "manual air release valve". Then the reclaiming is in progress. Close off water, electricity and gas. Complete the whole process.

            Related tags: 真空炉

            National Hotline

            0512-53630028
            Address: No.1, Nanzhuan Road, Shuangfeng
            town, Taicang, Suzhou, Jiangsu
            Email: 1306769879@qq.com

            Pay attention to us
            Copyright ?http://www.serunique.com/en/ Taicang Huarui Vacuum Furnace Co., Ltd 专业从事于Vacuum furnace,Vacuum gas quenching furnace,Vacuum oil quenching furnace, 欢迎来电咨询!
            Welcome to leave us a message
            Please enter your message here, we will contact you as soon as possible。
            Contact person
            Landline / mobile number
            Xiangyun platform technical support
            免费无码不卡中文字幕在线,中文字幕无码不卡免费视频,中文字幕无码不卡一区二区三区,中文无码不卡人妻在线看,人妻无码不卡中文字幕在线视频}